The plant · Aberthaw, Wales

Built where thecoal plant stood.

Halvard One reuses the grid connection, sea cooling water, roads and rail of a power station that closed in 2020. Construction starts in 2027.

Site9 hectares
Grid400 kV
Peak jobs1,200
First power2034
Halvard One · Aberthaw, Wales

A power stationthat fits on abrownfield site.

We build where coal plants stood. The cooling water, the grid connection and the workforce are already there. Tap a building to see what it does.

Aerial view of an industrial site with mountains behind
01 · Tokamak hall42 m

The machine sits in a 42 m hall under a steel dome, on the footprint of the old coal plant's boiler house.

The site

What one plant does for a town.

1,200

people on site at the peak of construction

250

permanent jobs once the plant runs

520 MW

of heat for the Vale of Glamorgan network

3.2 TWh

of electricity a year, about 7 % of Wales

On site

From coal yardto coil hall.

Cooling water from the Severn estuary
01 · Cooling water from the Severn estuary
Full-scope control room simulator, Cardiff
02 · Full-scope control room simulator, Cardiff
Coil winding line, Culham
03 · Coil winding line, Culham
Site walk, week 212
04 · Site walk, week 212
The 400 kV connection, kept live since 2020
05 · The 400 kV connection, kept live since 2020
Neighbours: the Port Talbot works
06 · Neighbours: the Port Talbot works
Milestones

Fifteen years froma drawing to the grid.

Hottest plasma so far
—
2019

Founded in Cardiff

Four engineers from the national lab spin out with a design for a compact, high-field tokamak.

2021

First HTS magnet

A 20-tonne superconducting coil holds 12 tesla for 100 hours straight.

2023

Test machine H-0

First plasma in our half-scale device, 11 million °C for 0.3 seconds.

2025

Record shot

H-0 holds 94 million °C for 8 seconds, a record for a machine its size.

2026

Site consent

Planning consent for Halvard One on the former Aberthaw coal site.

2029

Hall complete

The tokamak hall and turbine refurbishment finish. Coils arrive by sea.

2032

First plasma, H-1

Halvard One lights for the first time.

2034

Power to the grid

400 MW, sold to four offtakers under 20-year contracts.

For neighbours

What changesnext door.

Less than the coal plant was. The loudest part is the turbine hall, which is enclosed, and the site is quieter at the fence than the A4226 road.

Yes. The plant holds about two grams of fuel at a time, cannot run away, and is regulated like a hospital's radiation facilities. Our safety case is public.

Most heavy parts, including the magnets, arrive by sea at the old coal jetty. Peak road traffic is about a third of what the coal plant generated.

We have committed to 40 % of construction jobs and 60 % of permanent roles going to people living within 30 km, with a paid apprenticeship scheme starting in 2026.

Yes. The visitor centre opens in 2027. Until then we run a monthly open evening in Barry.

Suppliers

Build itwith us.

We are buying civil works, cryogenics, turbine refurbishment and heavy lift for Halvard One. Register as a supplier and we will send the packages as they open.